top of page

Top 10 PLC Interview Questions with Answers 2023.

Updated: Jul 28, 2023


PROGRAMMABLE LOGIC CONTROLLER IMAGE
This is the image of Allen Bradley PLC

1. Question: What is a PLC?

Answer: A PLC is a programmable logic controller, a specialized industrial computer used to control automation processes and machinery. It reads inputs from sensors and other. devices, processes the data using a program, and then triggers outputs to control the operation of machines or processes.


2. Question: What are the basic components of a PLC system?

Answer: The basic components of a PLC system include:

- CPU (Central Processing Unit)

- Memory (RAM and ROM)

- Input modules (to read signals from sensors)

- Output modules (to control actuators or devices)

- Communication ports (for data exchange with other systems)

- Power supply


3. Question: What is the scan cycle in PLC programming?

Answer: The scan cycle is the main execution cycle of a PLC program. It consists of three stages: input scan, program execution, and output update. During the input scan, the PLC reads the state of all input devices. Then, it executes the program logic based on the input data. Finally, it updates the output devices according to the program's results.


4. Question: Explain the difference between a latch and a flip-flop in PLC programming.

Answer: In PLC programming, a latch is a type of output instruction that "latches" its output in an energized state when the enabling condition is true and retains this state until a reset condition occurs. On the other hand, a flip-flop is a type of output instruction that changes state (toggles) each time the enabling condition becomes true. Flip-flops are often used for alternating control actions, while latches are used for maintaining a specific output state.


5. Question: How do you handle PLC programming errors or faults?

Answer: When handling PLC programming errors or faults, it's essential to implement proper error handling routines. This may involve using error bits or flags to indicate specific fault conditions and then executing corrective actions or alarms. Additionally, logging and displaying error messages can help troubleshoot and diagnose issues effectively.


6. Question: What is the difference between a PLC timer and a PLC counter?

Answer: PLC timers and counters are both used for sequencing events, but they serve different purposes. A timer is used to introduce time delays in a control process. It starts counting when it's enabled and reaches a preset value, after which it activates its output. In contrast, a counter is used to count events or pulses. It increments its value whenever a specified event occurs, and when the count matches a preset value, it activates its output.


7. Question: Explain the concept of PLC scan time and how it affects the system.

Answer: PLC scan time refers to the time it takes for a PLC to complete one full scan cycle. It includes reading inputs, executing the program, and updating outputs. The scan time is crucial because it determines the system's responsiveness and performance. A shorter scan time is generally preferred, especially in high-speed applications, as it allows the PLC to react quickly to changes in the process.


8. Question: What are PLC scan time optimization techniques?

Answer: PLC scan time optimization is essential for improving system performance. Some techniques to achieve this include:

- Writing efficient and concise ladder logic code.

- Using efficient addressing methods for I/O and data.

- Reducing the number of program layers and jumps.

- Minimizing the use of complex mathematical operations.

- Utilizing hardware-specific optimizations and features.


9. Question: How do you implement a PID (Proportional-Integral-Derivative) controller in PLC programming?

Answer: Implementing a PID controller in PLC programming involves writing code that calculates the control output based on the error signal (the difference between the desired setpoint and the actual process value). The PID controller takes into account the proportional, integral, and derivative terms to compute the control action that minimizes the error and maintains stable control of the process.


10. Question: Can you explain the concept of PLC scan cycle overlap and its impact on system behavior?

Answer: PLC scan cycle overlap occurs when the execution of one scan cycle overlaps with the start of the next cycle. This can happen due to the processing time taken by the CPU or due to high-priority tasks interrupting the normal scan cycle. Scan cycle overlap can lead to unpredictable behavior in the control system, such as timing inaccuracies and output flickering. PLC programmers should consider this factor while designing critical control systems to ensure stability and reliability.


bottom of page